Castle Hill Public School
The school had a very hot asphalt space as the main play/assembly area. It desperately needed shade. Sun Shade policies used by schools support provision of adequate shade in schools. This huge Claw Umbrella structure provides plenty of shade.
Engineering ensured loads were correctly calculated as all loads were placed on only two posts. These telescopic mast posts spread the load but gave the appearance of a graduating light weight structure.
Conflict with and safety for students was the highest priority. Some beams were 12m long and heavy equipment was required for lifting and excavation. Construction required compliance to risk management procedures for all stages of the project.
Materials
Galvanised Steel Frame
Colour
Bundeena Blue Monotec 370 Shadecloth
Size
243sm